OUR WORK – CASE STUDY 2

Buliding 1
Overview

PROJECT OVERVIEW: External works to a property in North London

Timescale: 4 Weeks

  • Re-pointing of 10 sq metres of damaged external walls
  • Cutting back 70 bricks and fitting new brick tiles
  • Creating a proper drainage system from the roof area
  • Carrying out repair works to the flat roof
  • Building a new tiled roof to the flat porch
  • Rebuilding dropped arches to windows
  • Creating proper drainage systems to the balconies
Services

Related Projects